EV charger installation cost in Dallas, 2026

Dallas–Fort Worth installers who publish prices charge about $800 for a charger within 10 feet of the panel and $1,300 for a 10–50 foot run, before the charger and permit; most DFW Level 2 installs land between $800 and $2,500. A City of Dallas stand-alone electrical permit for a single-family home is $181 plus a $15 technology fee. Texas has no broad home charger rebate in Dallas, but Oncor customers can get $100 off a Level 2 charger through Oncor’s online marketplace.

Last reviewed Nov 2, 2026 · All figures cited

Typical install
$800
Install with charger within 10 ft of panel (charger, permit and panel work not included) · Charge Pro Texas (installer), checked Nov 2, 2026
Top rebate
$100 off
Oncor Marketplace instant discount on a Wallbox Pulsar Plus 48A charger ($799 to $699) · Oncor Marketplace, checked Nov 2, 2026
Permit fee
$196
City of Dallas stand-alone electrical trade permit, single-family ($181 permit fee plus $15 technology fee) · City of Dallas Planning and Development, Service First Bulletin #204, checked Nov 2, 2026

Cost breakdown

Line itemFigureSourceChecked
Install with charger within 10 ft of panel (charger, permit and panel work not included)$800Charge Pro Texas (installer)Nov 2, 2026
Install with 10–50 ft run (charger, permit and panel work not included)$1,300Charge Pro Texas (installer)Nov 2, 2026
Install with 50 ft or longer run, detached garage or trench$2,000+Charge Pro Texas (installer)Nov 2, 2026
NEMA 14-50 outlet only, permit included$800–$1,200Beachy Electric (installer)Nov 2, 2026
Tesla Wall Connector hardwired install, permit included$1,200–$1,800Beachy Electric (installer)Nov 2, 2026
Panel upgrade (100A to 200A) plus EV circuit, inspection included$2,800–$4,500Beachy Electric (installer)Nov 2, 2026
Most DFW Level 2 installs, permit and inspection included$800–$2,500Clements Electric (installer)Nov 2, 2026
Turnkey install including charger hardware, permit and inspection$1,400–$2,800Destined Energy (installer)Nov 2, 2026
City of Dallas stand-alone electrical trade permit, single-family ($181 permit fee plus $15 technology fee)$196City of Dallas Planning and Development, Service First Bulletin #204Nov 2, 2026

Rebates

RebateAmountSourceChecked
Oncor Marketplace instant discount on a Wallbox Pulsar Plus 48A charger ($799 to $699)$100 offOncor MarketplaceNov 2, 2026
  • The Oncor discount is for homes with Oncor as the electric delivery provider; homeowners and renters with the owner’s permission qualify, limited to one unit per address.
  • It is a discount on buying the charger through Oncor’s marketplace, not a rebate on installation.
  • Dallas homes buy power from retail electric providers, which may have their own EV plans; those are not covered here.

Permits

The City of Dallas requires a separate stand-alone electrical permit for new branch circuits and panel work, and lists the single-family electrical trade permit at $196, made up of a $181 permit fee and a $15 technology fee (City of Dallas Service First Bulletin #204). The city’s fee schedule, effective July 1, 2025, shows the $181 base for single-family alterations plus $100 for each additional trade (City of Dallas permit fee schedule). Suburbs such as Plano, Frisco and Irving set their own fees.

Not yet verified:
  • The $196 permit figure comes from a city bulletin about solar and backup power; we have not confirmed with the city that it is the exact charge for an EV charger circuit.
  • A separate $100 trade inspection fee is listed in that bulletin; whether it applies to an EV charger permit was not confirmed.
  • Permit fees in Dallas suburbs are not covered here.
  • Retail electric provider EV plans and credits are not covered here.
  • Installer response testing (who replies to quote requests) has not been done yet.
  • Third-party trackers report the federal 30C charger tax credit ended for chargers placed in service after June 30, 2026; we have not verified this with the IRS.

Last reviewed Nov 2, 2026. Spot an outdated figure? See our methodology.