EV charger installation cost in Miami, 2026

Miami installers who publish prices quote about $400–$1,500 for a Level 2 install, and one puts most Miami homes at $1,200–$2,000 all-in with the charger and permit; older homes needing a 200A panel upgrade can reach $4,000–$6,500. FPL has no cash rebate, but its EVolution Home program installs a Level 2 charger with no upfront cost for $36 a month (or $27 if you already have a permitted 240-volt circuit) on a 10-year agreement.

Last reviewed Nov 3, 2026 · All figures cited

Typical install
$400–$1,500
Typical installed cost including Miami-Dade permit and inspection · Charge Home Solutions (installer), checked Nov 3, 2026
Top rebate
$36/month
FPL EVolution Home, full installation with new 240-volt circuit (no upfront cost, 10-year agreement) · FPL, checked Nov 3, 2026
Permit fee
$45
City of Miami residential trade permit when estimated cost is under $2,500 (state and county surcharges extra) · City of Miami Building fee schedule (Exhibit C, R-26-0200), checked Nov 3, 2026

Cost breakdown

Line itemFigureSourceChecked
Typical installed cost including Miami-Dade permit and inspection$400–$1,500Charge Home Solutions (installer)Nov 3, 2026
Level 2 installation, depending on panel distance and charger type$400–$1,200Legacy Electrical Contractors (installer)Nov 3, 2026
Garage near a 200A panel, under 15 ft, charger and permit included$800–$1,200APLUS (installer)Nov 3, 2026
Typical Miami home, charger, labor, materials and permit included$1,200–$2,000APLUS (installer)Nov 3, 2026
Storm-zone (HVHZ) outdoor install with 30–60 ft conduit run$2,000–$3,500APLUS (installer)Nov 3, 2026
Older home with 100A to 200A panel upgrade plus full install$4,000–$6,500APLUS (installer)Nov 3, 2026
City of Miami residential trade permit when estimated cost is under $2,500 (state and county surcharges extra)$45City of Miami Building fee schedule (Exhibit C, R-26-0200)Nov 3, 2026

Rebates

RebateAmountSourceChecked
FPL EVolution Home, full installation with new 240-volt circuit (no upfront cost, 10-year agreement)$36/monthFPLNov 3, 2026
FPL EVolution Home, equipment-only (existing permitted 240-volt circuit)$27/monthFPLNov 3, 2026
  • FPL EVolution Home is a 10-year agreement, not a month-to-month plan, and is not a rebate; the monthly charge covers the charger, installation and maintenance.
  • Charging energy is billed separately on your FPL bill, at about 7¢/kWh off-peak and about 28¢/kWh on-peak, and the rates can change with Florida PSC approval.
  • You keep the charger after completing the agreement, and you are responsible for weather damage and a stable Wi-Fi connection.

Permits

The City of Miami charges residential trade permits (up to three units) at 0.50% of the estimated construction cost, fixed at $45.00 when the estimated cost is under $2,500.00, with a $110.00 minimum permit fee and state and Miami-Dade County surcharges on top (City of Miami fee schedule, adopted April 23, 2026). Homes in unincorporated Miami-Dade or other cities such as Miami Beach or Coral Gables pull permits from their own building departments.

Not yet verified:
  • The City of Miami schedule lists both a $45 fee for residential work under $2,500 and a $110 minimum permit fee; we have not confirmed with the city which applies to a typical EV charger permit.
  • A non-refundable application fee and solid waste surcharge are reported by third-party permit guides; we have not confirmed the amounts on the city schedule.
  • Permit fees in unincorporated Miami-Dade County and other cities are not covered here.
  • Installer response testing (who replies to quote requests) has not been done yet.
  • Third-party trackers and one installer report the federal 30C charger tax credit ended for chargers placed in service after June 30, 2026; we have not verified this with the IRS.

Last reviewed Nov 3, 2026. Spot an outdated figure? See our methodology.