EV charger installation cost in Orlando, 2026

Orlando installers who publish prices start at $624 for a 20-amp circuit and $854 for a full-speed 60-amp circuit within 10 feet of the panel, with a typical garage install at $950–$1,400 including the permit; the charger is extra. The City of Orlando’s electrical permit starts at $66.24 plus a 3% technology surcharge. OUC, the city’s main utility, has no home charger rebate (its $200 rebate is for buying or leasing an EV), while Duke Energy Florida customers can get $7.50 a month for off-peak charging.

Last reviewed Oct 31, 2026 · All figures cited

Typical install
$624
Basic install, 20A circuit, within 10 ft of panel (charger not included) · ChargeOrlando (installer), checked Oct 31, 2026
Top rebate
$200
OUC rebate for buying or leasing an EV (not the charger) · OUC, checked Oct 31, 2026
Permit fee
$650–$950
Receptacle or charger near the panel, under 20 ft, permit included · In Phaze Electric (installer), checked Oct 31, 2026

Cost breakdown

Line itemFigureSourceChecked
Basic install, 20A circuit, within 10 ft of panel (charger not included)$624ChargeOrlando (installer)Oct 31, 2026
Full-speed install, 60A circuit, within 10 ft of panel (charger not included)$854ChargeOrlando (installer)Oct 31, 2026
Additional wire beyond 10 ft$10/ftChargeOrlando (installer)Oct 31, 2026
Receptacle or charger near the panel, under 20 ft, permit included$650–$950In Phaze Electric (installer)Oct 31, 2026
Typical garage install, 20–60 ft run, 50–60A circuit, permit included$950–$1,400In Phaze Electric (installer)Oct 31, 2026
Long run, subpanel or load management$1,400–$1,900In Phaze Electric (installer)Oct 31, 2026
Basic electrical install, up to 5 ft on the panel wall, 60A breaker (charger and permit extra)$819Go Electric Chargers (installer)Oct 31, 2026
Permit and admin fee charged by installer$225–$425Go Electric Chargers (installer)Oct 31, 2026
City of Orlando residential electrical permit, first $1,000 of construction cost (plus $11.03 per additional $1,000 and 3% technology surcharge)$66.24City of Orlando residential permit fees, effective January 2026Oct 31, 2026

Rebates

RebateAmountSourceChecked
OUC rebate for buying or leasing an EV (not the charger)$200OUCOct 31, 2026
Duke Energy Florida Off-Peak Charging Credit, Level 2 charger$7.50/monthDuke Energy News CenterOct 31, 2026
Duke Energy Florida Charger Prep Credit, residential (wiring and panel work, not the charger)Up to $819 per chargerEV Charging Help (third-party tracker)Oct 31, 2026
  • OUC serves most of the City of Orlando; Duke Energy Florida serves other parts of Orange, Seminole and Osceola counties. Check which utility bills you before counting on any credit.
  • OUC asks customers to contact it before installing a 240-volt charger.
  • Duke’s Off-Peak Charging Credit pays for charging 10 a.m. to 6 p.m. and 11 p.m. to 5 a.m. on weekdays, and anytime on weekends and holidays.
  • Duke’s Charger Prep Credit covers outlets, wiring and other electrical upgrades for Level 2 or higher charging, but not the charger hardware, software or permit fees.

Permits

Inside city limits, the City of Orlando requires an electrical permit plus an associated engineering permit, issued to a licensed general or electrical contractor, with signed and sealed plans submitted through ProjectDox (City of Orlando EV charging permits). The residential electrical permit fee is $66.24 for the first $1,000 of construction cost, plus $11.03 for each additional $1,000 up to $25,000, plus a 3% technology surcharge (City of Orlando permit fees). Homes in unincorporated Orange County get permits from the county instead.

Not yet verified:
  • The engineering permit fee for a home EV charger in the City of Orlando was not confirmed.
  • The $819 Duke Energy Florida Charger Prep Credit amount comes from a third-party tracker; Duke’s own residential page could not be checked.
  • ChargeOrlando says a typical city permit costs $77–$100, but we have not confirmed that total with the city.
  • Orange County permit fees for homes outside city limits are not covered here.
  • Installer response testing (who replies to quote requests) has not been done yet.
  • Orlando installers report the federal 30C charger tax credit ended for chargers placed in service after June 30, 2026; we have not verified this with the IRS.

Last reviewed Oct 31, 2026. Spot an outdated figure? See our methodology.