EV Install Cost
Home › City guides › Riverside

EV charger installation cost in Riverside, 2026

Riverside installers who publish prices quote about $1,000 to $1,600 for a typical Level 2 install, with one listing $1,299–$1,600 including the city permit. The City of Riverside charges $66 per residential EV charger plus a $41 permit issuance fee. Riverside Public Utilities pays up to $1,500 toward a new Level 2 charger and its installation, or up to $2,500 for customers in its SHARE low-income program.

Last reviewed Nov 2, 2026 · All figures cited

Typical install
$1,299–$1,600
Typical Level 2 install, permit included · ElectriCare (installer), checked Nov 2, 2026
Top rebate
Up to $1,500
RPU Level 2 residential charger rebate (charger, permit, labor and installation) · Riverside Public Utilities, checked Nov 2, 2026
Permit fee
$66
City of Riverside electrical permit, residential EV charger (each), FY 2026–27 · City of Riverside Fees and Charges Schedule, checked Nov 2, 2026

Cost breakdown

Line itemFigureSourceChecked
Typical Level 2 install, permit included$1,299–$1,600ElectriCare (installer)Nov 2, 2026
Typical installed cost, Riverside County permit and inspection included$400–$1,500Charge Home Solutions (installer)Nov 2, 2026
Level 2 install, starting price, permit included when applicableFrom $995Build Bright Home Solutions (installer)Nov 2, 2026
Home charger install, range depending on distance and panel$750–$2,500Rizzo Electric (installer)Nov 2, 2026
Electrical work only (charger not included)$400–$1,200Fowles Electric (installer)Nov 2, 2026
Panel upgrade, if needed$1,500–$3,500Fowles Electric (installer)Nov 2, 2026
City of Riverside electrical permit, residential EV charger (each), FY 2026–27$66City of Riverside Fees and Charges ScheduleNov 2, 2026
City of Riverside electrical permit issuance fee (14% surcharge added)$41City of Riverside Fees and Charges ScheduleNov 2, 2026

Rebates

RebateAmountSourceChecked
RPU Level 2 residential charger rebate (charger, permit, labor and installation)Up to $1,500Riverside Public UtilitiesNov 2, 2026
RPU Level 2 charger rebate for customers enrolled in the SHARE low-income programUp to $2,500Riverside Public UtilitiesNov 2, 2026
RPU rebate for installing a time-of-use meterUp to $1,000Riverside Public Utilities 2026 bill insertNov 2, 2026
  • Only active Riverside Public Utilities electric customers qualify, and the charger must be installed at the applicant’s home in RPU territory. Parts of the wider Riverside area are served by Southern California Edison instead.
  • The charger must be new, wall-mounted, and use a J1772 or J3400 (Tesla) connector. An outlet on its own is not eligible.
  • A City of Riverside electrical permit and the inspector’s sign-off are required, and the application is due within 180 days of installation.
  • The rebate cannot exceed actual project cost, is limited to one per household every three years, and is first-come, first-served while funding lasts.

Permits

The City of Riverside’s Building and Safety Division issues residential EV charger permits over the counter using a simplified checklist, with no plans or load calculations needed in most cases (City of Riverside EV charger guidelines). The FY 2026–27 schedule lists $66 per residential EV charger plus a $41 electrical permit issuance fee, to which a 14% surcharge is added (City of Riverside fees and charges). Homes outside city limits get permits from Riverside County instead.

Not yet verified:
  • The exact all-in city permit total for a typical install, including any extra circuit fees, was not confirmed with the city.
  • Riverside County permit fees for homes outside city limits are not covered here.
  • Southern California Edison programs for homes in the wider Riverside area are not covered here.
  • The $1,000 time-of-use meter rebate comes from RPU’s 2026 bill insert; its full terms were not checked.
  • Installer response testing (who replies to quote requests) has not been done yet.
  • Third-party trackers report the federal 30C charger tax credit ended for chargers placed in service after June 30, 2026; we have not verified this with the IRS.

Last reviewed Nov 2, 2026. Spot an outdated figure? See our methodology.